Feature Request: "Performance" Option per Package

Enterprise user. I'd like to be able to specify the "Concurrent Targets Per Deployment" setting on a per-package basis, as I find myself having to flip this setting back and forth and coordinate it with which package I'm running

0

Comments

3 comments
Date Votes
  • I would love this option as well. There are times when I have a very small package (performance-wise) that I wouldn't mind deploying to 1k machines at a time, but several packages where I want to put a cap on.

    0
  • I would like this too. When I deploy the Graylog Collector Sidecar, I have to limit it to only 1 or 2 at a time or it can overwhelm Graylog.

    0
  • Yup, I'm for this. I have script tasks that I don't care WHEN they get there, just that they do. I'd rather them take a back seat to more pressing packages. In SCCM, we were able to make a deployment as Low, Medium, High. I'd be fine with something like that too.